    Construction steps of geomembrane composite with non-woven

    Release time:2020-4-7    This article is read :6078 Times

    Taking the construction of geomembrane composite with non-woven in Huyan tank as an example, it is divided into several steps, such as clearing the foundation, laying the underlying layer, laying the geomembrane composite with non-woven and welding, and covering the protective layer. Construction steps of geomembrane composite with non-woven

    1. Clean the base surface of the pool slope

    Before laying the geomembrane composite with non-woven, the ribbed hard objects that may damage the geomembrane composite with non-woven on the base surface of the pool slope should be removed, the pits should be filled, and the slope surface should be treated according to the requirements. The slope flatness and compaction must meet the design requirements. Only then can the underlying layer of the geomembrane composite with non-woven be laid.

    2. Laying of the underlayer

    The underlayment of geomembrane composite with non-woven in Huyan reservoir is a coarse sand underlay with a thickness of 20cm. When laying the sand cushion layer, use long-arm backhoe and belt conveyor to feed the ice-cutting platform foundation and the pool bottom to the slope surface respectively, use the shovel to pave it flatly, and then sprinkle water to compact it. The relative density of the sand cushion layer after compaction meets the design requirements The geomembrane composite with non-woven can be laid later.

    3. Welding test of geomembrane composite with non-woven

    The joint of the geomembrane composite with non-woven should be tested on site to determine the parameters such as welding temperature, walking speed of the welding machine, temperature adjustment coefficient, etc. The site construction can be carried out after the test results are approved.

    4. Laying of geomembrane composite with non-woven

    The laying of geomembrane composite with non-woven consists of four processes: paving → bonding of the bottom geotextile → geomembrane welding → welding quality inspection → surface geotextile stitching

    4.1 Visual inspection before paving of geomembrane composite with non-woven

    The geomembrane composite with non-woven should be inspected for its appearance quality before paving. The geomembrane is not allowed to have trachoma, defects and impurities, and record and repair the mechanical damage and other defects that occur, and replace it seriously.

    4.2 Laying method of geomembrane composite with non-woven

    The laying of geomembrane composite with non-woven is divided into two parts: pool slope laying and pool bottom laying. When laying, the construction should be carried out in a weather with a temperature above 5 ° C, a wind force below 4 and no rain or snow, in accordance with the order of the pipeline operation, and manual laying is adopted. Laying method: After passing the acceptance check, the pool slope rolls from top to bottom and connects with the geomembrane composite with non-woven at the bottom of the pool using a T-shaped connection. In order to ensure the overall quality of the waterproof layer, avoid the formation of cross seams. During the laying process, the operator should wear flat-bottomed shoes or soft rubber shoes. The machine should not crush the geomembrane and its protective layer. If the geomembrane is damaged during construction, it should be repaired in time.

    4.3 Problems to be noted in welding

    The bottom geotextile of the geomembrane composite with non-woven is bonded with a hot air welding gun, and the geomembrane is welded by the hot melt welding method. In order to ensure the welding quality, the welding should be carried out in the factory as much as possible. It must be spliced at the construction site, the construction quality of the splicing site must be well controlled, and on-site inspection and careful inspection should be done. After the welding of the geomembrane is completed, the top layer geotextile is sutured after passing the inspection. The top layer geotextile is sutured by a portable sewing machine and sutured by Nylon thread. At the joint of the geomembrane, pay attention that the membrane above the slope on the same section should be pressed above the membrane below.

    4.4 Overlay protective layer

    The protective layer overlying the Huyan reservoir is composed of sand cushion, graded crushed stone and concrete prefabricated blocks, with thicknesses of 20cm, 30cm and 15cm, respectively. After welding the geomembrane composite with non-woven and passing the quality acceptance, the sand cushion layer, graded crushed stone and concrete prefabricated blocks should be laid in time to prevent its easy aging and other factors caused damage under ultraviolet irradiation.

    geomembrane composite with non-woven

    Construction steps of geomembrane composite with non-woven
    Previous:Precautions for GCL constructionnext:Construction notes of GCL

    Contact Us:

    WeChat public account

    Taian Hongyuan Geosynthetics Co., Ltd.

    Phone / Wechat / What's app:+86-18653810085

    Telephone / Fax: + 86-538-6598877

    Email:  hongyuanmakela@163.com

    Website: www.taianhongyuan.com

    Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

    Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

    主站蜘蛛池模板: 亚洲国产成人麻豆精品| 欧美色视频日本| 欧美三级日韩三级| 精品黑人一区二区三区| 亚洲精品制服丝袜二区| 狠狠v日韩v欧美v| 一边摸一边做爽的视频17国产| 免费看黄片一区二区三区| 伊人蕉久影院| 午夜a视频| 亚洲有码在线播放| 在线无码私拍| 国产黄色免费看| 韩国v欧美v亚洲v日本v| 成人年鲁鲁在线观看视频| 欧美国产日本高清不卡| 国产一区二区人大臿蕉香蕉| 欧洲熟妇精品视频| 精品国产aⅴ一区二区三区| 国产欧美在线观看一区| 波多野结衣第一页| 亚洲高清无在码在线无弹窗| 国产一区免费在线观看| 嫩草国产在线| 免费视频在线2021入口| 亚洲国产成人自拍| 欧美.成人.综合在线| 亚洲国产综合精品中文第一| 999精品在线视频| 日韩国产黄色网站| 亚洲成人网在线播放| 91精品免费久久久| 欧美爱爱网| 国产精品尤物在线| 成人日韩欧美| yy6080理论大片一级久久| 2022精品国偷自产免费观看| 中文精品久久久久国产网址| 午夜国产精品视频| 又爽又大又光又色的午夜视频| 中文字幕无码中文字幕有码在线| 国产亚洲精品精品精品| 韩日无码在线不卡| 精品国产福利在线| 美女国内精品自产拍在线播放 | 亚洲有码在线播放| 在线播放精品一区二区啪视频| h视频在线播放| 精品国产成人三级在线观看| 亚洲精品动漫| 中文字幕2区| 亚洲视频免费在线看| 免费三A级毛片视频| 日韩无码真实干出血视频| 91系列在线观看| 国内99精品激情视频精品| 亚洲第一区在线| 国产精品视频第一专区| 大陆精大陆国产国语精品1024| 潮喷在线无码白浆| 国产日韩欧美一区二区三区在线 | 亚洲国产精品久久久久秋霞影院| 成人毛片免费在线观看| 一区二区日韩国产精久久| 欧美一区日韩一区中文字幕页| 亚洲日韩图片专区第1页| 日韩激情成人| 国产一在线观看| 国产丰满大乳无码免费播放| 国产自无码视频在线观看| 日韩在线播放中文字幕| 成人国内精品久久久久影院| 天堂网亚洲系列亚洲系列| 欧美日本激情| 91麻豆久久久| 亚洲欧美国产五月天综合| 国产内射在线观看| 乱人伦99久久| 国产导航在线| 亚洲午夜福利在线| 黄色免费在线网址| 久久精品人人做人人爽电影蜜月|