    Construction steps of geomembrane composite with non-woven

    Release time:2020-4-7    This article is read :6078 Times

    Taking the construction of geomembrane composite with non-woven in Huyan tank as an example, it is divided into several steps, such as clearing the foundation, laying the underlying layer, laying the geomembrane composite with non-woven and welding, and covering the protective layer. Construction steps of geomembrane composite with non-woven

    1. Clean the base surface of the pool slope

    Before laying the geomembrane composite with non-woven, the ribbed hard objects that may damage the geomembrane composite with non-woven on the base surface of the pool slope should be removed, the pits should be filled, and the slope surface should be treated according to the requirements. The slope flatness and compaction must meet the design requirements. Only then can the underlying layer of the geomembrane composite with non-woven be laid.

    2. Laying of the underlayer

    The underlayment of geomembrane composite with non-woven in Huyan reservoir is a coarse sand underlay with a thickness of 20cm. When laying the sand cushion layer, use long-arm backhoe and belt conveyor to feed the ice-cutting platform foundation and the pool bottom to the slope surface respectively, use the shovel to pave it flatly, and then sprinkle water to compact it. The relative density of the sand cushion layer after compaction meets the design requirements The geomembrane composite with non-woven can be laid later.

    3. Welding test of geomembrane composite with non-woven

    The joint of the geomembrane composite with non-woven should be tested on site to determine the parameters such as welding temperature, walking speed of the welding machine, temperature adjustment coefficient, etc. The site construction can be carried out after the test results are approved.

    4. Laying of geomembrane composite with non-woven

    The laying of geomembrane composite with non-woven consists of four processes: paving → bonding of the bottom geotextile → geomembrane welding → welding quality inspection → surface geotextile stitching

    4.1 Visual inspection before paving of geomembrane composite with non-woven

    The geomembrane composite with non-woven should be inspected for its appearance quality before paving. The geomembrane is not allowed to have trachoma, defects and impurities, and record and repair the mechanical damage and other defects that occur, and replace it seriously.

    4.2 Laying method of geomembrane composite with non-woven

    The laying of geomembrane composite with non-woven is divided into two parts: pool slope laying and pool bottom laying. When laying, the construction should be carried out in a weather with a temperature above 5 ° C, a wind force below 4 and no rain or snow, in accordance with the order of the pipeline operation, and manual laying is adopted. Laying method: After passing the acceptance check, the pool slope rolls from top to bottom and connects with the geomembrane composite with non-woven at the bottom of the pool using a T-shaped connection. In order to ensure the overall quality of the waterproof layer, avoid the formation of cross seams. During the laying process, the operator should wear flat-bottomed shoes or soft rubber shoes. The machine should not crush the geomembrane and its protective layer. If the geomembrane is damaged during construction, it should be repaired in time.

    4.3 Problems to be noted in welding

    The bottom geotextile of the geomembrane composite with non-woven is bonded with a hot air welding gun, and the geomembrane is welded by the hot melt welding method. In order to ensure the welding quality, the welding should be carried out in the factory as much as possible. It must be spliced at the construction site, the construction quality of the splicing site must be well controlled, and on-site inspection and careful inspection should be done. After the welding of the geomembrane is completed, the top layer geotextile is sutured after passing the inspection. The top layer geotextile is sutured by a portable sewing machine and sutured by Nylon thread. At the joint of the geomembrane, pay attention that the membrane above the slope on the same section should be pressed above the membrane below.

    4.4 Overlay protective layer

    The protective layer overlying the Huyan reservoir is composed of sand cushion, graded crushed stone and concrete prefabricated blocks, with thicknesses of 20cm, 30cm and 15cm, respectively. After welding the geomembrane composite with non-woven and passing the quality acceptance, the sand cushion layer, graded crushed stone and concrete prefabricated blocks should be laid in time to prevent its easy aging and other factors caused damage under ultraviolet irradiation.

    geomembrane composite with non-woven

    Construction steps of geomembrane composite with non-woven
    Previous:Precautions for GCL constructionnext:Construction notes of GCL

    Contact Us:

    WeChat public account

    Taian Hongyuan Geosynthetics Co., Ltd.

    Phone / Wechat / What's app:+86-18653810085

    Telephone / Fax: + 86-538-6598877

    Email:  hongyuanmakela@163.com

    Website: www.taianhongyuan.com

    Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

    Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

    主站蜘蛛池模板: 无码aaa视频| 亚洲婷婷六月| 好紧太爽了视频免费无码| 一区二区在线视频免费观看| 免费a在线观看播放| 国产成人一区免费观看| 试看120秒男女啪啪免费| 欧美国产成人在线| 爆乳熟妇一区二区三区| 五月丁香在线视频| 亚洲自拍另类| 午夜无码一区二区三区在线app| 国产原创演绎剧情有字幕的| 亚洲成在人线av品善网好看| 一级一级特黄女人精品毛片| 国产在线观看人成激情视频| 亚洲欧美日韩中文字幕在线一区| 亚洲Av综合日韩精品久久久| 久久77777| 国产精品3p视频| 亚洲日韩图片专区第1页| 亚洲欧美另类视频| 久久国产高清视频| 亚洲一区精品视频在线| 天天色综合4| 日韩视频精品在线| 亚洲第一精品福利| 91无码人妻精品一区| 国产三级国产精品国产普男人| 亚洲男人的天堂久久香蕉 | 精品一区二区三区水蜜桃| 国产精品伦视频观看免费| 欧美中文字幕在线二区| 怡红院美国分院一区二区| 欧美日韩激情| www精品久久| 国产精品手机在线播放| 美女内射视频WWW网站午夜| 2021亚洲精品不卡a| 国产高潮流白浆视频| 久久无码av三级| 香蕉国产精品视频| 国产在线自乱拍播放| 国产一级α片| 国产大片喷水在线在线视频| 好吊妞欧美视频免费| 国产91特黄特色A级毛片| 欧美成人一级| 日韩精品毛片| 亚洲精品桃花岛av在线| 国产尤物jk自慰制服喷水| 在线看AV天堂| 国产免费自拍视频| 日本手机在线视频| 国产AV无码专区亚洲精品网站| 乱色熟女综合一区二区| 丁香六月激情婷婷| 一级爆乳无码av| 中文字幕在线观| 国产欧美在线观看视频| 国产精品视频导航| 婷婷丁香色| 99精品热视频这里只有精品7| 91精品视频在线播放| 亚洲精品老司机| 成人一级黄色毛片| 国产本道久久一区二区三区| 伊人久久综在合线亚洲2019| 超级碰免费视频91| 57pao国产成视频免费播放| 国产成人高清精品免费5388| 91无码人妻精品一区| 亚洲天堂自拍| 亚洲天堂免费在线视频| 国产成人综合亚洲网址| 一级毛片免费的| 天天色综网| 99久久精品无码专区免费| 日本www在线视频| 亚洲欧美日韩另类在线一| 欧美亚洲一区二区三区导航 | 亚洲美女久久|